New Energy: Xpeng Huitian X3 Mass Production Plant General Contracting Project

In response to the stringent requirements for process cooling in the manufacturing of new energy vehicles. Huayuan Electromechanical acted swiftly to provide heat exchange solutions and delivered them on schedule, ensuring the smooth start-up of the customer’s production line.

Xpeng Huitian X3 Mass Production Factory

In response to the stringent requirements for process cooling in the manufacturing of new energy vehicles.

Huayuan Electromechanical acted swiftly to provide heat exchange solutions and delivered them on schedule, ensuring the smooth start-up of the customer’s production line.

Frequently Asked Questions

View all →

After the equipment arrives, professional technicians can be provided on-site to give a briefing and guide the equipment installation, takeover, and commissioning. Peripheral pipes, valves, and other auxiliary materials can be supplied as needed, making it a one-stop project solution.

The standard model has a delivery time of 4-6 weeks, while customized corrosion-resistant or permanent magnet models take a bit longer. Delivery includes the main equipment and key components, and we also provide installation dimensions, piping, civil construction, and electrical control support plans.

Doesn’t include civil construction, but it provides technical parameters for civil work like equipment loads, foundation sizes, and installation spacing. It also gives a full set of construction recommendations, including piping layout, valve selection, and system coordination control.